|

First flight calorimeter being lowered into the 1x1 EM grid. |

Tracker Testing at INFN - Pisa |

Completed Grid with Grid Engineer |
|

Calorimeter Assembly at NLR - Pre Electrics Module (PEM) being assembled |

Seven completed PEMs in ESD covers await electronics for completion of CAL modules |

Data Acquisition Software Test Bed |
|

DAQ continued |

LAT Assembly Stand Base |

Engineering Model Mini-Tower |
|

Corner of Bottom Tracker Tray Showing Grid to Tracker Interface (L) and Special Interface hardware (R) |

LAT Table Plant Mockup |

I&T Mini-Cal/TEM shimming and insertion in mockup |

I&T Mini-Cal/TEM shimming and insertion in mockup |

I&T Mini-Cal/TEM shimming and insertion in mockup |

I&T Mini-Cal/TEM shimming and insertion in mockup |

I&T Tracker installation training |

I&T Tracker installation training |

I&T Tracker installation training |

I&T Tracker installation training |

Grid on CMM Checking Dimensions |

Candidate Gamma-ray Event in First LAT Flight Tower |

6 towers installed |

Picking up the last 3 caliometers |

The LAT ground cooling system |

Single LAT tower |
|
|
If you have a question about analyzing Fermi Gamma-ray Space Telescope science data, please contact us via the Feedback form.